As always, this service crew is bringing their A-game to the forefront and getting these last cranes up and electrified! These are 100 Ton, 80’ span double girder cranes with SCC double modular trolleys. Both trolleys have 50 Ton hoists, and one has an auxiliary 10 Ton hoist. Thanks, crew, for all your hard work and getting it done, even in this cold weather!